Nobody plans to be moving house at Christmas; it happens because a chain finally completes, a tenancy ends on the 31st, or a job starts in the first week of January. A December move is workable, but it runs on a calendar with holes in it: conveyancers close, banks do not move money on bank holidays, removal firms shut for a week. This guide covers picking a completion date, booking removals, schools and utilities, and what to leave until January.
Completion dates: the days that do not exist
Completion needs the buyer’s bank, the seller’s bank and both solicitors working on the same day, because the purchase money moves by same-day bank transfer and the keys are released when it lands. Christmas Day, Boxing Day and New Year’s Day are bank holidays in England and Wales, as are the substitute days when they fall at a weekend; the gov.uk bank holiday list shows the exact dates each year. No completion happens on those days. Most conveyancing firms also close from around 23 December to 2 January, and many will not agree a completion in that window at all.
The practical result is that December completions cluster on the last two full working weeks before Christmas, which is also when removal firms are busiest and most expensive. If you have any say in the date, aim for the second week of December or the second week of January. Avoid the Friday before Christmas: if the money is late, you cannot complete until the next working day and the removal van has already been paid for.
Booking removals for a December move
Removal firms treat the ten days before Christmas as peak season and most close from Christmas Eve until the first working day of January. Book as soon as exchange is likely, not after it happens, and ask about the firm’s cancellation and postponement terms in writing in case the chain slips. A quote should be written, given after a survey (in person or by video), and should confirm goods in transit and public liability insurance. Members of the British Association of Removers work to a code approved under the Trading Standards Consumer Codes Approval Scheme, which includes an advance payment guarantee and an independent dispute scheme; that cover is worth having when a date may move.
- Get two or three written quotes after surveys, with the December date stated.
- Confirm the firm’s insurance and the postponement terms in writing.
- Ask whether the crew works on the 23rd or the 27th, and what the surcharge is.
- Book storage for a week if there is a gap between completion dates over the holiday.
Our guide to the best and worst times of year to move explains why late December prices run 10 to 25 per cent above a quiet January week.
Schools, doctors and the admin that stops for a fortnight
Schools break up around 19 December and the admissions teams at local councils, which handle in-year transfers, close with them. If the move takes a child out of catchment, apply for the in-year place before the end of term so the new school can offer a start in January rather than February. Register with a GP surgery near the new house in the first week of January; most surgeries do not process new registrations over the closure.
Set up postal redirection a week before the move, because the service needs notice and the Christmas post is slow. Tell the council at both ends for council tax and the electoral roll, update the driving licence and vehicle registration online (both can be done on gov.uk at any time), and tell the bank, the employer and the insurers. Home insurance in particular should be in place at the new property from the day of completion, not the day you move in.
Utilities and the house itself in cold weather
Take meter readings for gas, electricity and water at both properties on the day, photograph them with the date showing, and send them to the suppliers within a day or two. A December move into a house that has been empty means a cold house: check the boiler fires, the radiators warm and the stopcock turns before the van is unloaded, because a frozen pipe is a Christmas Day emergency nobody wants. If you smell gas, leave the building and call the National Gas Emergency Service on 0800 111 999; for a power cut call 105.
Leave the heating on low at the house you are leaving if completion is a few days after you move out, and tell your buyer you have done so. For a rented property, our guide to what landlords and tenants each owe at move-out covers the check-out inspection and the deposit.
Moving house at Christmas with the decorations
The tree, the lights and the presents are the one category of moving-day cargo that cannot wait a week. Keep them out of the main load: pack decorations in a labelled crate that travels in your car, and keep presents, wrapping and the Christmas food in the car too, because the removal van may be unloaded in a different order from the one you expect. If the new kitchen is not usable on arrival, a box with the kettle, mugs, a saucepan, plates and a bottle opener goes in last and comes out first.
Children handle a Christmas move better when the first room set up is theirs. Ask the crew to unload bedrooms before the living room, make the beds, and leave the boxes of books and kitchen equipment for the days between Christmas and the New Year, when there is little else to do and the shops are shut anyway.
When to call a professional
A small flat and a flexible date can be moved with a man and van on any working day in December. A chain completion, a family house or a date that cannot move is a job for a removal company with a written quote, confirmed insurance and clear postponement terms, booked weeks ahead. Our free help desk reviews every moving house at Christmas enquiry, confirms the firm’s availability and credentials for the date you need, and only then puts you in touch; nothing is booked until the team confirms. Send the details through the request help page and we will come back to you.
Questions people ask
Can you complete on a house purchase between Christmas and New Year?
Only on a working day when both solicitors and both banks are open. Christmas Day, Boxing Day and New Year's Day are bank holidays, and the money cannot move on those dates. Many conveyancing firms close from around 23 December to 2 January, so check with yours early and avoid the Friday before Christmas as a completion date.
Are removal companies more expensive in December?
Yes. The ten days before Christmas are peak season and typical prices run 10 to 25 per cent above a quiet January week. Most firms close from Christmas Eve to the first working day of January. Book as soon as exchange looks likely, get the date in a written quote and confirm the postponement terms in case the chain slips.
What should I do about my child's school when moving at Christmas?
Apply to the new council for an in-year school place before the end of the autumn term, because admissions teams close with the schools from around 19 December. An application made before the break can usually produce a January start. Keep the current school informed, and ask for records to be transferred once a place is confirmed.
What utilities admin needs doing on moving day?
Photograph the gas, electricity and water meters at both properties with the date showing and send the readings to the suppliers within a day or two. Check the boiler, radiators and stopcock at the new house before unloading. Home insurance should start on completion day, and the council needs notifying at both ends for council tax.
Ready to take the next step?
Tell the household desk what has happened, where you are and when you need help. We will review it and explain your options.
Describe your job →Guidance is general and refers to the authority that sets each rule. Costs are indicative ranges; always get written quotes. Trade availability and credentials are confirmed when you enquire.
